📞 Hotline: 0935 042 919
🕐 T2-T6: 8h-18h · T7: 8h-12h
✉ sales@shipasia.vn
💬 Zalo
Quote in ≤4h
VIEN
ShipAsia logo
  • Shipping Routes
  • Book a Sailing
  • Services
  • Schedules
  • Articles
  • About
  • Contact
  • Shipping Routes
  • Book a Sailing
  • Services
  • Schedules
  • Articles
  • About
  • Contact
📞Talk to us+84 935 042 919
Get a quote
CORE INTRA-ASIA LANE · #1 BY VOLUME

Container Shipping Vietnam ↔ India

LANE DEEP-SEA — VN exporting ultra India $3.2 billion year 2024 (+22%). HCM-Nhava Sheva 13-15 days direct. Form AI (AIFTA — ASEAN-India FTA). BIS mark for 380+ products. Consulting anti-dumping steel, monsoon Mumbai, Mundra hub new.

  • Support CO form AI (AIFTA) — 0% deeper preferential than RCEP for textile, electronics
  • Reefer 40' RF — pre-cool 6-8h, meet quarantine HQ BIS
  • Direct service Cat Lai → Nhava Sheva, transit 8-10 days, 4-5 sailings/week
  • Consulting on correct destination port (Nhava Sheva/Chennai/Kolkata) — avoid a loss of $200-500/container trucking inland Korea

📩 Get a quote — VN-India route

Response within 4 hours business · Free consulting form AI + BIS mark + port destination Mumbai/Chennai/Mundra

Trade volume XK VN → India (2024, billion USD)
$ 0 billion
Total import-export two-way VN-India (2024, billion USD)
+ 0 billion
Destination port main at India
0
Frequency direct sailings VN-India
0 /week
INDICATIVE RATES · MONTH 5/2026

Ocean rates 3 main routes VN-India

Market reference rate range for 4 container types — contact ShipAsia for accurate VN shipment quote-India.

🚢 HCM → Nhava Sheva (Mumbai)

Cai Mep → Nhava Sheva (JNPT) · Transit 13-15 days direct · 2-3 sailings/week

20' GP$400 – $800
40' GP$700 – $1,300
40' HC$750 – $1,400
40' RF$2,000 – $3,500

🚢 HCM → Chennai (Madras)

Cat Lai → Chennai · Transit 14-17 days (transship) · 3-4 sailings/week · Gateway South India

20' GP$400 – $800
40' GP$700 – $1,300
40' HC$750 – $1,400
40' RF$2,200 – $3,800

🚢 HCM → Mundra (Gujarat)

Cai Mep → Mundra (Adani) · Transit 17-20 days (transship) · Hub new side West

20' GP$450 – $850
40' GP$750 – $1,400
40' HC$800 – $1,500
40' RF$2,300 – $4,000

⚠️ Market reference rate range for VN-India route. Rates real-world needs quote each lot — contact ShipAsia for accurate quote.

TOP 5 KEY EXPORT INDUSTRIES

Top 5 export industries to India + documentation notes

Solar batteries

40'HC. Year-round (India push strong renewable energy, target 500GW 2030). Form AI (AIFTA). ⚠️ BIS certification MANDATORY for equipment electronics — register 6-8 weeks before exporting.

Steel

20'/40'GP. Q1-Q3. Form AI. ⚠️ Anti-dumping of India very strict with steel VN — check DGTR (Directorate General of Trade Remedies) for HS specific before quote. Have case duty increases 30-50%.

Electronics, LED

40'HC. Year-round. Form AI; BIS mark MANDATORY + Energy Efficiency Label for LED. ShipAsia connect lab India certify before exporting.

Coffee, pepper

20'GP. Q4-Q1. Form AI; Phyto; Health Cert if coffee processing. India import coffee VN for roasting inland + re-export to Bangladesh, Sri Lanka.

Rubber, chemicals

20'GP, ISO tank. Q4-Q2 (rubber tapping season). Form AI. Chemicals needs MSDS + UN packaging if DG class. India use rubber VN for industrial tires.

CARRIERS & SAILING FREQUENCY

Route VN-India — overview carrier, frequency, routing

HCM (Cai Mep) → Nhava Sheva direct

2-3 sailings/week direct · Transit 13-15 days · Reliability cao

HCM → Chennai (transship)

3-4 sailings/week · Transit 14-17 days · Via Singapore/Colombo · South India

HCM → Mundra (transship)

2-3 sailings/week · Transit 17-20 days · Hub new Adani Gujarat

HP → India (transship)

Almost all transship via Singapore/Colombo · Few direct · Transit 19-23 days

REAL CLIENT PAIN POINTS

3 common client cases for India exports — and how ShipAsia handles them

CASE 01BIS · Electronics

LED held at Nhava Sheva due to missing BIS mark — products mandatory CRS

Client: a company exporting LED to Mumbai.
Issue: Clients to Nhava Sheva held because products on the list of mandatory BIS (Bureau of Indian Standards) - CRS (Compulsory Registration Scheme) but not yet register. Container storage fee + risk re- exporting.
How process ShipAsia: Check BIS requirement before exporting; if does not have, guidance register BIS through agent India (process 6-8 weeks + fee $1,500-3,000); while wait BIS, a number of case can clear by commitment companies + bond reduces risk.
CASE 02Anti-dumping · Steel

Galvanized steel sheet is India imposes anti-dumping → duty import increases 30-50%, client rejection

Client: a company exporting galvanized steel sheet to Chennai.
Issue: HS on the list of India apply anti-dumping with steel VN → duty import increases spike 30-50%, client India rejection receive. Shipment must re- exporting or sell reduces price.
How process ShipAsia: Consulting check tariff schedule MFN + anti-dumping list of DGTR (Directorate General of Trade Remedies) before quote; transfer HS code other if can (e.g. steel finished goods tor because sell finished goods); or transfer to form RCEP if HS code that RCEP for preferential better than AIFTA.
CASE 03Transship · Singapore

Solar panels transship Singapore is roll → delayed 7-10 days

Client: a company exporting solar panels to Mumbai.
Issue: Sailings transship via Singapore is roll due to congestion → delayed 7-10 days vs schedule. Other India violates contract delivery → must $5,000.
How process ShipAsia: Priority booking carrier have direct VN-Mumbai (although high rate more than $100-200/cont) tor because transship; if must transship, choose Singapore (PSA) stable more than Port Klang; setup buffer 5-7 days within contract delivery to avoid penalty.
💡 INSIDER TIPS — NO ONE TELLS YOU

5 tips ShipAsia shares from the field VN-India route

📋 Form AI (AIFTA) vs RCEP — check each HS

AIFTA (2010) popular for VN-India, preferential for most HS. A number of HS can use RCEP (2022) if benefit more than. ShipAsia check tariff schedule MFN-AIFTA-RCEP for each HS code before deciding form.

🏷️ BIS mark mandatory cho 380+ products

Into India — electronics, toys, steel, cement, automotive parts. Not have BIS → held at port. Register through agent India 6-8 weeks + $1,500-3,000. ShipAsia connect agent register fast.

⚠️ Anti-dumping India very strict with steel, chemicals, yarn VN-China

Check DGTR (Directorate General of Trade Remedies) before quote. Duty anti-dumping can jumps 30-50% unexpectedly. ShipAsia have expert verify HS code and update list updates each quarter.

🌧️ Avoid ETA Mumbai season monsoon (T6-T9)

Monsoon causes congestion + slow cargo handling Nhava Sheva 3-7 days. Recommend plan delivery avoid peak monsoon or transfer to Mundra (Gujarat) — few impact monsoon more than.

🚀 Mundra (Adani) currently up hub new — near industrial zone automotive Maruti/Tata

Mundra port (Adani Group, Gujarat) development fast, near the industrial zone automotive large (Maruti Suzuki, Tata Motors). A number of case cheaper than Mumbai $50-100/cont, few congestion more than. Suitable client West India (Gujarat, Rajasthan).

TRANSIT TIME · CUT-OFF · FREQUENCY

Transit time detailed the pairs port VN-India

RouteCut-off SITransit (sea)TotalFrequency
HCM (Cai Mep) → Nhava Sheva (direct)Mon before 12:0013-15 days14-16 days2-3/week
HCM → Nhava Sheva (transship Singapore)flexible16-19 days17-20 daysdaily
HCM → Chennai (transship)flexible14-17 days15-18 days3-4/week
HCM → Mundra (transship)flexible17-20 days18-21 days2-3/week
HP → Nhava Sheva (transship)Wed before 12:0019-23 days20-24 days2/week
FREQUENTLY ASKED QUESTIONS · LANE VN-INDIA Degree

5 most common questions clients ask ShipAsia

Exporting LED to India needs BIS mark not?
Have, mandatory. LED located within CRS (Compulsory Registration Scheme) of BIS. Register loses 6-8 weeks + fee ~$1,500-3,,000 via India agent. Must have BEFORE exporting, not have will held at port. ShipAsia connect agent BIS have experience increases speed process.
HCM-Mumbai have direct not or must transship?
Have a number of direct sailings (2-3/week from Cai Mep), still again transship via Singapore (most popular), Port Klang, Colombo. Direct is 3-5 days faster + reduces roll risk. Rates direct higher than $100-200/cont but worthwhile because reliability higher than.
Galvanized sheet VN exporting India have risk anti-dumping not?
High. India imposes anti-dumping with many HS steel from VN-China (hot-rolled coil, galvanized coil, steel pipe). Before quoting, check DGTR (Directorate General of Trade Remedies) for HS specific. Have case duty import spike 30-50%. ShipAsia have expert verify HS + updates list quarter.
Season monsoon to Mumbai have is impact not?
Have. Month 6-9 monsoon causes congestion, slow cargo handling at Nhava Sheva 3-7 days. If can, plan delivery avoid peak monsoon (T7-T8 heavy most) or transfer to Mundra (Adani Gujarat) — few impact monsoon more than because side West.
Form C/O which preferential most for VN→India?
Form AI (AIFTA — ASEAN-India FTA, effect 2010) is main. A number of HS code can use form RCEP (2022) if preferential better than. Rubber, pepper, coffee: form AI good. Korean electronics: check both 2 form. ShipAsia compare tariff schedule MFN-AIFTA-RCEP for each HS code before deciding.

Port pairs specific route VN — India

View rate details, transit time, cut-off and Top 3 industry for each pairs port (3 pairs)

HCM → Chennai HCM-Chennai 14-16 days, South India. industrial zone automotive Toyota/Hyundai/Renault, textile. Form AI preferential. Anti-dumping check D… View details → HCM → Mundra 🚀HUB NEW: HCM-Mundra 15-17 days. Adani Gujarat, near Maruti/Tata, few congestion more than Nhava Sheva. Form AI 0%. Qu… View details → HCM → Nhava Sheva 🥇LANE MAIN India: HCM-JNPT/Nhava Sheva 13-15 days direct, 3 sailings/week. Hub Mumbai, Form AI (AIFTA), ⚠️BIS mar… View details →

Ready to start your VN export-India route?

Get a quote within 4 hours + consulting exempt fee form AI (AIFTA) + BIS mark + anti-dumping verify + port destination Mumbai/Chennai/Mundra

📩 Get a quote route VN-India
💬 Chat Zalo ngay
Scroll to Top